This contract calls for the design, fabrication, delivery, installation, testing, and warranty of refractory‑lined ductwork and a new heat‑exchanger for a fluidized‑bed incinerator at the H.L. Mooney Advanced Water Reclamation Facility, with an optional assessment of a backup heat exchanger. The work is performed under a firm‑fixed‑price, one‑year term with the possibility of up to four one‑year extensions. The agency emphasizes SWaM participation but does not set a mandatory set‑aside. The award was made to Industrial Furnace Co Inc. Key elements include:
• Complete fabrication and installation of custom ductwork and a TTC‑specified heat exchanger, meeting strict dimensional and performance compatibility.
• Mandatory site‑visit attendance (April 27 2026 and May 11 2026) with required PPE.
• Extensive documentation, warranty (5 years), and as‑built deliverables required.
• Performance and payment bonds equal to 100 % of the contract price, and comprehensive insurance requirements.