Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Ohio guideOhio Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Ohio
  4. ›Construction
  5. ›Erect & Dismantle high bridge scaffolding system

Awarded contract·Cuyahoga County·Ohio

Erect & Dismantle high bridge scaffolding system

$6kSingle Award
Contract source

Description

This contract concerns the erection, rental, and dismantling of a high‑bridge scaffolding system beneath the Fairmount Bridge in Cleveland. The county requires a 28‑day rental with the scaffolding erected by October 1 2022, including a solid top deck, guard rail, ladder access, anchored jacks, and beam‑clamp connections. The solicitation was posted on a very short 8‑hour window, and quotes were to be submitted via email. The award amount recorded is $5,819.74, but the vendor’s identity is not disclosed. The work is time‑critical, mission‑critical, and limited to vendors able to meet the tight erection deadline and safety requirements. Registration with the Cuyahoga County Inspector General’s Office and the Lawson electronic purchasing system is mandatory. • Scope: Scaffold erection (6 ft × 14 ft × 12 ft), safety features, 28‑day rental, dismantling. • Critical deadline: Erection must be completed by 1 Oct 2022. • Procurement: Extremely short posting window; likely sole‑source/limited competition. • Value: Awarded line shows $5,819.74 (vendor not named).

Attached files

Key dates

Bids closed
9/28/2022
Starts
9/28/2022
Ends
10/29/2022
Duration
32 days

Last updated

Details

Award type
Single Award
Procurement
Sole Source
Industry
Construction
NAICS
238990
Solicitation №
3622

Contract value

$5,819

The only monetary figure in the portal data is the “TotalAwardedByLine” amount of $5,819.74 for the single awarded line. No other cost breakdown, unit price, or total contract ceiling is provided. Given the short‑term, 28‑day rental nature of the work and the modest amount, it is reasonable to assume the entire contract value is approximately $5,820. This estimate assumes the $5,819.74 reflects the full price for erection, rental, and dismantling, with no additional fees or change orders.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

City of Treasure Island·Florida

Top match · 68%

Bascule Bridge HVAC Unit Replacement

Closes 11/18/2026Opened 10/28/2026

U.S. Department Of The Interior·Louisiana

67% match

Y--Scaffolding for Repair and Repoint Chalmette Monum

Closes 11/13/2026Opened 10/13/2026

Missouri Department of Transportation·Missouri

67% match

STL District, City of St. Louis, Removal and Replacement of Southwest and Columbia Bridges

Closes 11/10/2026Opened 10/7/2026

City of High Point·North Carolina

66% match

Bid 09-110426 Bridges Preservation Project

Closes 11/4/2026Opened 10/2/2026

City of St. Louis·Missouri

66% match

Removal & Replacement of Southwest & Columbia Bridges

Closes 11/10/2026Opened 10/7/2026

City of St. Louis Board of Public Service·Missouri

66% match

Removal & Replacement of Southwest & Columbia Bridges

Closes 11/10/2026Opened 10/7/2026

City of Creve Coeur·Missouri

66% match

Malcolm Terrace Park Bridge and Deer Creek Stabilization

Closes 11/12/2026Opened 10/22/2026

Virginia Department of Transportation·Virginia

64% match

B12 CII_2026 SS - HIGH RISE BRIDGE BASCULE REPAIR

Closes 11/18/2026Opened 9/9/2026

New York City Department of Environmental Protection·New York

64% match

82626B0015-BWT-TI-181 Replacement of the Multi-Rake Climber Screen & Degritting System Installation

Closes 12/2/2026Opened 10/21/2026

City of Cedar Rapids·Iowa

64% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

U.S. Department Of Agriculture·California

64% match

HUMBOLT PACIFIC CREST TRAIL BRIDGE REPLACEMENT

Closes 11/28/2026Opened 10/29/2026

City of Charlotte·North Carolina

64% match

Bridge Repairs

Rolling / TBD closeOpened 1/1/2027

Agency of Transportation - Contract Administration·Vermont

64% match

Berlin-Highgate IM BPNT(18)

Closes 11/20/2026Opened 10/28/2026

City of Cedar Rapids·Iowa

64% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

City of Lime Springs·Iowa

64% match

Lime Springs, City of 100,000 Gallon Elevated Tower Reconditioning

Closes 11/19/2026Opened 10/29/2026

City of Cedar Rapids·Iowa

64% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

Nyc Department of Citywide Administrative Services·New York

64% match

85626B0001-CSB Sidewalk Sheds and Scaffolding RC

Closes 12/16/2026Opened 9/22/2026

Missouri Department of Transportation·Missouri

64% match

Pulaski County, removal of the existing structure and construction of a new 98’-0” single span bridge with prestressed concrete NU-43 girders, etc.

Closes 11/30/2026Opened 10/30/2026

City of St. Louis Board of Public Service·Missouri

64% match

Union Lindell Bridge Replacement

Closes 11/3/2026Opened 9/16/2026