This contract is for slope and drainage repairs along the Maine Turnpike, from mile marker 0.0 to 109.1. The work includes drainage work, slope repairs, catch basin replacements, excavation, and replacing culvert pipe ends. The contract also includes provisions for traffic control, erosion control, and maintenance of traffic. The contractor is required to provide an earthwork crew, equipment, and materials to complete the work. The contract has a completion date of November 14, 2025, and the authority reserves the right to reject any or all proposals. Key aspects of the contract include:
* Drainage work and slope repairs
* Catch basin replacements
* Excavation and replacing culvert pipe ends
* Traffic control and maintenance of traffic
* Erosion control measures
* Earthwork crew and equipment requirements
* Completion date of November 14, 2025