This contract awards a single‑award, firm‑fixed‑price roof replacement project for Abbott Elementary School in Lynwood, California. The work includes full demolition of existing roofing on eight school buildings (B, D, E, F, G, H, I, K) and adjacent walkways, installation of a hot‑applied SBS‑modified bitumen membrane system (owner‑supplied POWERPLY ENDURE 100 rolls), new gutters, downspouts, flashing, and necessary deck repairs. The contractor must comply with California labor‑code prevailing‑wage requirements, provide performance and payment bonds (100 % of contract value), maintain a 10 % bid security, and meet a $35,000 allowance for unforeseen conditions. The schedule mandates a vacant‑building window (June 11 – July 9 2026) for four buildings and a total contract duration of 50 calendar days, with liquidated damages of $450 per day for overruns.