Awarded vendors
- G-B Construction, LLC
- Gunter Construction Company
- Kansas Heavy Construction, LLC
- O'Donnell and Sons Construction
- Linaweaver Construction, Inc.
- Schlagel and Associates
Description
The 2020 Cedar Creek Improvements Project involves the removal and replacement of approximately 7,175 square yards of full-depth portland cement concrete pavement with asphalt concrete pavement, as well as the removal and replacement of 4,720 linear feet of concrete curb and gutter. The project also includes spot concrete sidewalk replacement, installation of ADA sidewalk ramps, and curb inlet top replacement on 102nd Street and Highland Circle. The city of Olathe received bids from several construction companies, with G-B Construction, LLC being the lowest bidder at $612,942.85. The project is expected to improve the infrastructure and safety of the area.
• The project involves the removal and replacement of concrete pavement and curb and gutter.
• The project includes spot concrete sidewalk replacement and installation of ADA sidewalk ramps.
• The city of Olathe received bids from several construction companies.
• G-B Construction, LLC was the lowest bidder at $612,942.85.
• The project is expected to improve the infrastructure and safety of the area.