The City of Temple, Texas, is seeking bids for the construction of a 1,410 linear foot 6-foot wide concrete trail, four concrete bench pads, two keystone retaining walls, and a pavilion pad at Oak Creek Park. The project includes mobilization, furnishing and installation of various components, and removal of existing structures. The contract was awarded through an Invitation to Bid process, with a total of seven bidders submitting proposals. The key components of the project include the construction of the trail, installation of the pavilion foundation, life station pads, bench pads, accessible curb ramp, and keystone retaining curb/walls, as well as the removal of the park sign and existing trash receptacle.
• The project involves the construction of a 1,410 linear foot 6-foot wide concrete trail.
• The contract includes the installation of four concrete bench pads, two keystone retaining walls, and a pavilion pad.
• The project requires the removal of existing structures, including a park sign and trash receptacle.
• The contract was awarded through an Invitation to Bid process with seven bidders.
• The project includes mobilization and bonding requirements.