Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Florida guideFlorida Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Florida
  4. ›Civil Engineering
  5. ›PUMPING STATION CONTROLLER SYSTEM

Awarded contract·City of Palm Bay·Florida

PUMPING STATION CONTROLLER SYSTEM

$175kSingle Award
Contract source

Description

The City of Palm Bay is requesting bids for ten Pumping Station Controller Systems to be used at various locations throughout the city. The scope of the project includes delivery of all units, training, and a five-year warranty. Installation is not part of this project. The contract is funded by the U.S. Department of Energy under the Energy Efficiency and Conservation Block Grant (EECBG). Some key points to consider are: • The project requires the delivery of ten Pumping Station Controller Systems. • The scope of the project includes training and a five-year warranty. • Installation is not part of this project. • The contract is funded by the U.S. Department of Energy under the Energy Efficiency and Conservation Block Grant (EECBG). • The City of Palm Bay is the agency responsible for awarding the contract.

Attached files

Key dates

Last updated

Details

Award type
Single Award
Industry
Civil Engineering
NAICS
541330
Solicitation №
2012-0-47

Contract value

$175,000

The value of the contract can be estimated based on the scope of the project, which includes the delivery of ten Pumping Station Controller Systems, training, and a five-year warranty. The cost of such systems can vary depending on the complexity and specifications of the project. However, assuming an average cost of $10,000 to $20,000 per system, the total value of the contract could be estimated to be around $100,000 to $200,000. Additionally, the cost of training and the five-year warranty should also be considered, which could add another $10,000 to $50,000 to the total value. Therefore, a rough estimate of the contract value could be around $110,000 to $250,000.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

North Carolina Town of Cary·North Carolina

Top match · 65%

Swift Creek Pump Station PLC Improvements

Closes 11/9/2026Opened 10/15/2026

U.S. Department Of Defense·Massachusetts

62% match

RFI Process control system plumbing and programming

Closes 11/26/2026Opened 10/27/2026

City of Montpelier·Vermont

61% match

Wastewater Collection System – Suction Lift Pump Station Equipment Preselection

Closes 12/3/2026Opened 10/28/2026

U.S. Department Of Defense·District of Columbia

61% match

Turbomolecular Pumping Station

Closes 10/31/2026Opened 10/27/2026

West Basin Municipal Water District·California

61% match

Torrance Refinery Water Recycling Plant Programmable Logic Controller Replacements

Closes 11/5/2026Opened 9/23/2026

City of Key West·Florida

60% match

Pump Station R Rehabilitation

Closes 11/16/2026Opened 10/15/2026

West Basin Municipal Water·California

60% match

Torrance Refinery Water Recycling Plant Programmable Logic Controller Replacements

Closes 11/5/2026Opened 9/23/2026

St. John the Baptist Parish Government·Louisiana

59% match

RFQ 2026.30 Engineering Services for Vicknair Canal Pump Station

Closes 11/19/2026Opened 10/28/2026

U.S. Department Of Defense·Oklahoma

59% match

Upgrade X-Ray Controller

Closes 11/5/2026Opened 10/29/2026

U.S. Department Of Defense·Ohio

59% match

Vacuum Turbo Pumps

Closes 11/13/2026Opened 10/14/2026

Oregon Health and Science University·Oregon

59% match

Computer Aided Dispatch – Records Management System

Rolling / TBD closeOpened 2/13/2020

Town of Lexington·South Carolina

59% match

SERVICES FOR POTABLE WATER SYSTEM HYDRAULIC MODELING AND PROGRAM MANAGEMENT

Closes 11/5/2026Opened 9/16/2026

Dickenson County·Virginia

59% match

Dickenson County Public Service Authority Haysi Wastewater Treatment Plant

Closes 11/16/2026Opened 9/30/2026

City of Fort Myers·Florida

59% match

Sole Source - Xylem Water Solutions - Flygt Lift Station Pumps

Closes 11/4/2026Opened 10/14/2026

Brazos Valley·Texas

59% match

Well 6 Capacity Enhancement

Closes 11/12/2026Opened 10/21/2026

Brazos Valley·Texas

59% match

Upgrade of VFD (Variable Frequency Drive) Control from NXGI to NXGPro+ system

Closes 11/17/2026Opened 10/26/2026

U.S. Department Of Justice·Mississippi

59% match

Elevator Control System Modernization – FCC Yazoo City (Low II)

Closes 11/6/2026Opened 10/20/2026

U.S. Department Of Defense·Maryland

58% match

W912DR26X1B2N

Closes 1/8/2027Opened 1/8/2026

City of Tulsa·Oklahoma

58% match

Emergency Generator Cherry Creek Pump Station

Closes 11/18/2026Opened 10/21/2026

U.S. Department Of Veterans Affairs·Illinois

58% match

J043--Damen Sump Pump Control System Repair

Closes 11/6/2026Opened 10/28/2026

Jackson County Utility Authority·Mississippi

58% match

Pump Station #20 Rehab

Closes 11/17/2026Opened 9/20/2026

Georgia Emanuel County Board of Education·Georgia

58% match

Swainsboro High School Concession Stand Pump Station Upgrade

Closes 11/13/2026Opened 10/30/2026

University of Mississippi Medical Center·Mississippi

58% match

SS6009 for Pressure‑sensing Walkway System

Closes 11/13/2026Opened 10/26/2026

Gwinnett County Government·Georgia

58% match

Patterson Pump Station Rehabilitation

Closes 12/8/2026Opened 10/21/2026

Florida State University·Florida

58% match

Rotary Uninterruptible Power System

Closes 11/2/2026Opened 9/8/2026