The contract is for the exterior painting of the Walnut Park building, with multiple colors as indicated on the drawings. The contract was awarded to 3 Diamond with a bid amount of $350,000.00. The contract requires the contractor to apply route optimization strategies, recycle, reuse, and reduce waste, and include diverse suppliers, vendors, and subcontractors. The prevailing wage rates apply to this contract, and a bid bond, performance bond, and payment bond are required.