The 2015 Cedar Creek Street Improvements Project involves the construction of approximately 17253 square yards of full depth portland cement concrete pavement removal and replacement with asphalt concrete pavement, 9720 linear feet of concrete curb and gutter, sidewalk ramp replacement, and sidewalk replacement on several streets in the Cedar Creek Subdivision. The project also includes the installation of 6" OP modified AB-3, 2" BM-2 (FR) asphaltic concrete, and concrete sidewalk. The bid documents, including drawings and specifications, are available for download. The successful bidder will be required to furnish and pay satisfactory performance and payment bond or bonds.