The contract is for the construction of the Memorial Overland Emigrant Trail Phase 1, which involves the final layout, vegetation clearing, excavation, grading, and finishing of approximately 4 miles of new trail at Donner Summit area in Soda Springs, California. The trail is to be natural surface with a tread width of 2’ to 5’. The work also includes the installation of armored stream crossings, in slope turns, climbing turns, and grade reversals. The engineer's estimate for this project is $150,000, and the number of working days for this project is 60.
• The contract requires the contractor to possess a valid California Class A contractor's license or a C-12 Earthwork and Paving Contractor.
• The contract is subject to compliance monitoring and enforcement by the Department of Industrial Relations.
• The contractor shall furnish a payment bond and a performance bond, as well as certificates of liability and property damage insurance.
• The contract includes a pre-bid conference and job walk, which was held on July 9th, 2019.
• The contract was awarded to two vendors: Trailscape Inc and Eric Johnson dba Johnson Trails.