The City of Richland has awarded a contract for the Hains Levee and Riverfront Trail Repair project. The project includes the reconstruction of the existing pedestrian pathway, replacement of the crushed surface top course, asphalt pavement, clearing and grubbing of the existing vegetation, and tree removal. The contract was awarded to multiple vendors, and the final tabulation of bids is provided in the contract document. The estimated cost of the project is between $316,500 and $435,200.
• The project includes reconstruction of the existing pedestrian pathway
• Replacement of the crushed surface top course and asphalt pavement
• Clearing and grubbing of the existing vegetation and tree removal
• The contract was awarded to multiple vendors
• The estimated cost of the project is between $316,500 and $435,200