The City of Independence is soliciting bids for a water main replacement project. The project involves the installation of a 12" water main at 24 Highway and Crysler Avenue to River Boulevard and from River Boulevard from 24 Highway to Nickell Avenue. The bid tabulation summary lists the bid totals for four vendors: Hettinger Construction, Inc., Abay Construction, Inc., Linaweaver Construction, Inc, and Infrastructure Solutions. The bid totals range from $993,006.00 to $1,633,000.00.
• The project provides for 12" water main installation, including all necessary preparation work.
• The project is located at 24 Highway and Crysler Avenue to River Boulevard and from River Boulevard from 24 Highway to Nickell Avenue.
• The bid tabulation summary lists the bid totals for four vendors.
• The bid totals range from $993,006.00 to $1,633,000.00.
• The City of Independence is soliciting bids for this project.