The contract is for the AC Water Main Replacement 2021, Phase 1 project, which involves constructing approximately 11,100 LF of ductile iron water mains, installing new fire hydrant assemblies, and other related work. The project is located in Bellevue, WA, and the bid was submitted by multiple companies. The contract value is estimated to be around $4,567,027.82. Key aspects of the project include:
• Constructing water mains and installing fire hydrants
• Relocating existing utilities and abandoning asbestos cement pipe
• Restoring surface conditions, including asphalt trench patching and concrete curbs, gutters, and sidewalks
• Performing traffic control and other work as required to complete the project