Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Illinois guideIllinois Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More water and wastewater bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Illinois
  4. ›Water and Wastewater
  5. ›Primary Filtration Project Phase I, Capital Project No. 2022

Awarded contract·Four Rivers Sanitation Authority·Illinois

Primary Filtration Project Phase I, Capital Project No. 2022

Won by Williams Brothers Construction Inc. upon IEPA approval$19.5MSingle Award
Contract source

Awarded vendors

  • Williams Brothers Construction Inc. upon IEPA approval

Description

The Primary Filtration Project – Phase I is a design‑build, lump‑sum construction effort to install new primary‑filtration equipment and supporting civil, structural, mechanical, electrical, and control systems at the Four Rivers Sanitation Authority wastewater‑treatment plant in Rockford, Illinois. The scope includes demolition of existing clarifier structures, construction of wet‑well foundations, installation of cloth‑media disk filters, gravity‑belt thickener, associated pumps, variable‑frequency drives, instrumentation, HVAC, fire‑alarm, site grading, paving, and full start‑up, commissioning, and operator training. The contract is funded by an Illinois Environmental Protection Agency revolving‑loan (IEPA Project No. L17‑5882) and is subject to Davis‑Bacon prevailing‑wage, DBE participation, and extensive insurance and bonding requirements. The award was made to Williams Brothers Construction Inc., with a contract period of 597 calendar days from Notice to Proceed and liquidated damages for schedule overruns.

Attached files

Key dates

Bids closed
1/11/2022
Contract modified
1/10/2022
Duration
597 days

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Industry
Water Management and Sanitation
NAICS
237110
Solicitation №
21-408

Contract value

$19,523,000

The Addendum‑01 explicitly states an Engineer’s estimate of $19,523,000 for the entire Phase I effort. No other total contract value is disclosed, and the scope (civil works, equipment procurement, installation, start‑up, training, warranties, and extensive bonding/insurance) aligns with a project of roughly $20 M. Therefore the best estimate is the engineer’s figure, adjusted only for typical contractor markup, yielding an approximate contract value of $19.5 M.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

Town of Eatonville·Florida

Top match · 71%

Drinking Water – Phase 1

Closes 11/9/2026Opened 10/6/2026

The City of Columbus·Ohio

70% match

RFQ033611 - Central College Subtrunk, Phase 3 (650033-100003)

Closes 11/18/2026Opened 9/30/2026

City of Columbus Ohio·Ohio

69% match

Central College Subtrunk – Phase 3

Closes 11/18/2026Opened 9/8/2026

City of Bellevue·Washington

69% match

2027 Phase 1 Water Main Replacement

Closes 11/12/2026Opened 10/22/2026

Washington Suburban Sanitary Commission, MD·Maryland

69% match

Potomac WFP Water Quality/PFAS Pilot Project

Closes 12/1/2026Opened 10/14/2026

City of Rosenberg·Texas

69% match

Wastewater Treatment Plant Phase 2 - Collection System Rehabilitation

Closes 11/19/2026Opened 10/26/2026

Maryland Frederick County Government·Maryland

69% match

IFB #27-121-CP Water Distribution Improvements Phase II

Closes 11/10/2026Opened 9/10/2026

City of Columbus Ohio·Ohio

68% match

Intermodal Sanitary Subtrunk Phase 2

Closes 11/18/2026Opened 10/27/2026

Jackson County Utility Authority·Mississippi

68% match

WJC Process Improvements Phase 1

Closes 12/8/2026Opened 8/16/2026

City of Independence·Missouri

68% match

2024 Neighborhood Sanitary Sewer CIP Project No. 302004-2

Closes 11/4/2026Opened 10/7/2026

Public Water Supply District No. 2 of St. Charles County·Missouri

68% match

Western Transmission Main Phase 4C

Closes 11/19/2026Opened 10/9/2026

City of Austin·Texas

68% match

Davis Water Treatment Plant Filter System Improvements

Rolling / TBD closeOpened 10/2/2026

Riverton City·Utah

68% match

CC26-475 Main Water Tank Drainline Upgrade Project

Closes 11/17/2026Opened 10/30/2026

City of Ontario·California

68% match

Pure Water Ontario Advanced Water Purification Facility (UT1091)

Closes 11/13/2026Opened 10/15/2026

Town of Ponce Inlet·Florida

68% match

RFQ 2026-02 - TOWN OF PONCE INLET COLLECTION SYSTEM IMPROVEMENTS PHASE 1

Closes 11/19/2026Opened 10/20/2026

Town of Church Point·Louisiana

68% match

CHURCH POINT DETENTION AND FLOOD PROOFING PHASE 2 FOR THE LOUISIANA WATERSHED INITIATIVE

Closes 11/10/2026Opened 10/14/2026

City of Columbus·Ohio

68% match

Central College Subtrunk, Phase 3 (650033-100003)

Closes 11/18/2026Opened 9/2/2026

California Department of Transportation·California

68% match

Construct DPP infiltration areas, capture housing, bioswales, & MVPs.

Closes 11/10/2026Opened 9/28/2026

U.S. Department Of Defense·Missouri

68% match

Belle Fountain Ditch Cleanout Phase 2

Closes 11/3/2026Opened 10/13/2026

Alaska Department of Environmental Conservation·Alaska

68% match

Aleutian Homes Phase VII Water and Sewer Determination of Categorical Exclusion

Rolling / TBD closeOpened 8/17/2026

Fort Bend County Municipal Utility District No. 219C·Texas

68% match

Wastewater Treatment Plant No. 1 -Phase 1 (0.15 MGD) Lease to serve Fort Bend County Municipal Utility District No. 219C

Closes 11/5/2026Opened 10/16/2026

Tri‑Town Water District No. 1·Vermont

68% match

TRI-TOWN WATER DISTRICT NO. 1 - WATER TREATMENT FACILITY, 4TH FILTER ADDITION

Closes 11/17/2026Opened 10/19/2026

U.S. Department Of The Interior·Colorado

68% match

46--EC - LMDT MEMBRANE FILTERS

Closes 1/4/2030Opened 1/8/2021

Riverton City·Utah

68% match

CC26-475 Main Water Tank Drainline Upgrade Project

Closes 11/17/2026Opened 10/30/2026

City of Waco·Texas

68% match

Flat Creek Reuse Project Phase 1A

Closes 12/1/2026Opened 10/2/2026