Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Washington guideWashington Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More engineering services bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Washington
  4. ›Engineering Services
  5. ›Pacific Avenue Neighborhood Greenway Project

Awarded contract·City of Spokane·Washington

Pacific Avenue Neighborhood Greenway Project

Won by Toole Design Group, LLC$750kAwarded 11/27/2023Single Award
Contract source

Awarded vendors

  • Toole Design Group, LLC

Description

The City of Spokane issued a Request for Qualifications (RFQu #5896‑23) to develop a feasibility and alignment study for Phase 2 of the Pacific Avenue Neighborhood Greenway, a bicycle boulevard project. After a competitive process with four respondents, the City intends to award the contract to Toole Design Group, LLC. The scope includes project coordination, topographic/drone surveys, traffic data collection, geotechnical review, feasibility analysis, conceptual alignment plans, cost estimating, and a public‑outreach program with multiple stakeholder and public meetings. The contract is for a two‑year term beginning in July 2023, with the possibility of renewal by mutual agreement. No budget ceiling is disclosed; the award will be based on qualifications rather than a fixed price. • Scope: feasibility/alignment study, conceptual design (≈30 % design), cost estimates, and outreach. • Duration: 2 years (July 2023 – July 2025) with optional renewal. • Procurement: full open competition; award to Toole Design Group, LLC after evaluation of four proposals.

Attached files

Key dates

Bids closed
6/5/2023
Intent to award
11/27/2023
Awarded
11/27/2023
Starts
7/1/2023
Ends
7/1/2025Renews
Duration
2 years

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Industry
Engineering Services
NAICS
541330
Solicitation №
RFQu 5896-23

Contract value

$750,000

The solicitation does not disclose a budget. Based on comparable municipal greenway feasibility studies and alignment design contracts—typically ranging from $400,000 to $1,200,000 for a two‑year scope covering surveys, traffic analysis, conceptual design, cost estimating, and extensive public outreach—a reasonable midpoint estimate is roughly $750,000. This accounts for professional‑services rates in Washington, the breadth of tasks (survey, analysis, design, outreach), and the two‑year contract duration.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

City of Pasadena·California

Top match · 70%

El Molino Avenue Demonstration Project

Closes 11/6/2026Opened 10/7/2026

City of Harrisonburg·Virginia

68% match

Northend Greenway (NEG) Brookside ITB (2027020-PW-B)

Closes 12/10/2026Opened 10/22/2026

City of Seattle·Washington

67% match

Roosevelt Way Preservation (FHWA)

Closes 11/4/2026Opened 10/7/2026

City of Charlotte·North Carolina

67% match

Margaret Wallace Road Sidewalk Summerfield Ridge Ln to Marshbrooke Rd

Rolling / TBD closeOpened 7/1/2028

City of Culver City·California

67% match

Minor Pavement & Concrete Improvement Project (PZ-554) and Ocean Drive Sidewalk Project (PS-037)

Closes 11/19/2026Opened 10/29/2026

City of Philadelphia·Pennsylvania

66% match

PW Bid 2908-CONSTRUCTION of GSI in DEVEREAUX AVE from HAWTHORNE ST

Closes 11/5/2026Opened 10/14/2026

City of Portland·Maine

66% match

2026 Forest Avenue Sidewalk Project (PDF, 88.12 KB)

Closes 11/4/2026Opened 10/9/2026

City of Seattle·Washington

66% match

Highland Park Way SW Connection

Closes 11/4/2026Opened 10/14/2026

NYS East Fishkill, Town of·New York

66% match

RT 52 Pedestrian and Intersection Improvements

Closes 11/13/2026Opened 10/19/2026

City of Richmond·California

66% match

Richmond Greenway Bridge Project – Implementation Plan

Closes 11/19/2026Opened 10/19/2026

San Bernardino County·California

66% match

Randall Avenue Sidewalk

Closes 12/3/2026Opened 10/27/2026

Municipality of Anchorage·Alaska

66% match

4th Avenue Reconstruction – G Street to E Street (Project 21‑22)

Closes 11/4/2026Opened 10/7/2026

LA Public Works Engineering Bureau·California

65% match

CENTRAL AVENUE PEDESTRIAN IMPROVEMENTS & CENTRAL AVENUE STREETSCAPE IMPROVEMENTS FEDERAL NO. CML-5006(896) & FEDERAL NO.

Closes 12/9/2026Opened 10/28/2026

Village of Gurnee·Illinois

65% match

Public Works Paving Improvements Project

Closes 11/18/2026Opened 10/20/2026

City of Elk Grove·California

65% match

Laguna Creek Trail and Bruceville Road Sidewalk Improvements Project

Closes 11/17/2026Opened 10/15/2026

New York State Department of Environmental Protection·New York

65% match

82627P0002-BEPA: GI-PSE 1-3 Design Services Task Order Contract for Green Infrastructure in NYC Parks & City-owned Street Ends

Closes 11/18/2026Opened 10/21/2026

City of Pasadena·California

65% match

CDBG Sidewalk Improvement Project FY 2027

Closes 11/20/2026Opened 10/29/2026

City of Philadelphia·Pennsylvania

64% match

PW Bid 3993ECMS - MPMS 82199 Cottman Ave Redesign with GSI

Closes 12/3/2026Opened 10/16/2026

City of Ontario·California

64% match

Pedestrian Intersection Improvements and Pavement Rehabilitation Project

Closes 11/18/2026Opened 10/28/2026

The City of Anaheim·California

64% match

Katella Ave & State College Blvd Rehabilitation Project

Closes 11/5/2026Opened 10/15/2026

Illinois Natural Resources·Illinois

64% match

Recreational Corridor greenways and trails planning

Rolling / TBD closeOpened 7/1/2026

City of Pasadena·California

64% match

Annual ADA Citywide/Miscellaneous Sidewalk Improvement Program and Street Drainage Project FY 2027

Closes 11/20/2026Opened 10/29/2026

Maryland State Highway Administration·Maryland

64% match

HO5415179 - US 1 (Washington Boulevard) from MD 979 (Main Street) to Gorman Road Pedestrian Safety Action Plan

Closes 11/24/2026Opened 10/20/2026

City of Fresno·California

64% match

Chestnut Neighborhood Sidewalks

Closes 11/17/2026Opened 10/16/2026

City of Monterey·California

64% match

VETERANS PARK BIKE PATH, SEGMENT 4 PROJECT (NCP2435)

Closes 12/8/2026Opened 10/26/2026