Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Washington guideWashington Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Washington
  4. ›Construction
  5. ›PWC - WB CIP #55A AND CIP #55B DWSRF DWL23475 AND…

Awarded contract·Snohomish County PUD·Washington

PWC - WB CIP #55A AND CIP #55B DWSRF DWL23475 AND DWL23480, WARM BEACH WATER SYSTEM WATER REPLACEMENT PROJECT

Won by D & G Backhoe Inc.$1MSingle Award
Contract source

Awarded vendors

  • D & G Backhoe Inc.

Description

The contract is for the Warm Beach Water System Water Replacement Project, which includes the installation of a pressure reducing station and intertie connection to the Kayak Water System, as well as the installation of new water mains and associated fittings. The project also includes the installation of fire hydrant assemblies and appurtenances, and combination air vacuum release assemblies and blow-off assemblies. The primary purpose of the project is to replace aging water system infrastructure and create a redundant supply. The contract was awarded through a competitive bidding process, with an estimated value of $1,000,000.00. Some key features of the contract include: • The project is funded through the Washington State Drinking Water State Revolving Loan program with federal funds from the Environmental Protection Agency. • The contract is subject to Davis-Bacon/Prevailing Wage requirements and will be subject to the higher of the prevailing state or federal wage rates. • The District retains the right to reject any and all bids. • The contract includes a list of bid documents, including the contract documents, specifications, and drawings. • The contract has a scheduled bid award date of December 21, 2021.

Attached files

Key dates

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Industry
Construction
NAICS
237110
Solicitation №
21-1198-KS

Contract value

$1,000,000

The contract has an estimated value of $1,000,000.00, as stated in the Engineer's Estimate section. This estimate is based on the scope of work, which includes the installation of new water mains and associated fittings, as well as other construction activities. The actual value of the contract may vary depending on the bids received and the final contract award. Factors that may influence the contract value include the number of bidders, the complexity of the project, and the availability of materials and labor.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

U.S. Department Of Defense·North Carolina

Top match · 72%

Building SH50 Replace Water Source Heat Pump

Closes 11/19/2026Opened 10/30/2026

U.S. Department Of Defense·U.S. Armed Forces – Pacific

72% match

PMP for Water Facilities Circulation Systems

Closes 1/9/2027Opened 12/2/2025

City of San Diego·California

72% match

Otay WTP Raw Water PS Switchboard Replacement - ADVERTISEMENT ONLY

Closes 12/8/2026Opened 10/28/2026

City of Redlands·California

71% match

2026 CIP Water Pipeline Replacement Project

Closes 11/16/2026Opened 10/29/2026

City of Hollywood·Florida

71% match

Water Treatment Plant Maintenance Package ‘A’; Project No. 25-4261

Closes 11/25/2026Opened 10/20/2026

City of Neptune Beach·Florida

71% match

Water Treatment Plant Ground Storage Reservoir Rehabilitation

Closes 11/9/2026Opened 10/2/2026

U.S. Department Of Veterans Affairs·Missouri

71% match

657-27-107JC, Replace Select Hot Water Heating System

Closes 11/3/2026Opened 9/28/2026

University of Massachusetts System·Massachusetts

71% match

USuites Hot Water Replacement

Closes 11/4/2026Opened 10/21/2026

LA Water & Power·California

71% match

146409 WATER SOFTENER SYSTEM - RINALDI TOLUCA Chlorination Station

Closes 11/13/2026Opened 9/23/2026

Bristol Virginia Utilities Authority·Virginia

70% match

CAST IRON WATER LINE REPLACEMENT PROJECT - PHASE 1

Closes 11/5/2026Opened 10/1/2026

City of Hermosa Beach·California

70% match

CIP 623 - Pier Structural Repairs Project

Closes 11/12/2026Opened 10/15/2026

City of San Clemente·California

70% match

WRP Grit Classifier Replacement Project

Closes 11/19/2026Opened 10/22/2026

City of Wilmington·Delaware

70% match

25035PW-R – Porter Water Filter Plant Electrical Upgrade Project

Closes 11/3/2026Opened 10/8/2026

City of Troy, OH·Ohio

70% match

Miami Shores Golf Course Pump Control Panel and Well Project

Closes 11/4/2026Opened 10/14/2026

City of Dayton, Ohio·Ohio

70% match

Miami Water Treatment Plant Boiler Replacement

Closes 11/5/2026Opened 10/15/2026

State of Hawaii Department of Transportation – Harbors Division·Hawaii

70% match

P10904 Domestic & Fire Waterline Systems Replacement Pier 51A

Closes 12/3/2026Opened 10/8/2026