This solicitation calls for a qualified low‑voltage contractor to install single‑mode fiber, network racks, Ethernet cabling for future security cameras, and an antenna mast at the Morrow County Fairgrounds. The work includes aerial fiber runs, termination in new rack cabinets, and provision of lockable, weather‑proof enclosures, all compliant with Oregon Prevailing Wage requirements. The project is grant‑funded with a hard completion deadline of April 1 2026.
• Install 12‑strand single‑mode fiber with LC terminations at designated cabinets.
• Provide two‑post equipment racks, power, and lockable wall‑mounted network cabinets.
• Run Cat6 (or better) Ethernet drops to future camera locations and to a rooftop antenna mast.
• All labor, materials, testing, permits, and prevailing‑wage compliance must be included in a fixed‑price bid.