Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Virginia guideVirginia Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More architecture bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Virginia
  4. ›Architecture
  5. ›A/E Services for Construction of Wygal Hall Replacement…

Awarded contract·Longwood University·Virginia

A/E Services for Construction of Wygal Hall Replacement Building

Won by CJMW Architecture$4MSingle Award
Contract source

Awarded vendors

  • CJMW Architecture

Description

The Commonwealth of Virginia, through Longwood University, issued RFP LU214‑19‑022 seeking Architectural/Engineering (A/E) services to design and eventually manage construction of a new Wygal Hall replacement building (≈ 60,720 sf, 500‑seat concert hall) on the Farmville campus. The scope covers pre‑design, schematic, preliminary design, optional construction‑document preparation, and optional construction‑phase services, with LEED Silver sustainability targets, acoustic and HVAC upgrades, and compliance with state building codes. The contract is a negotiated, lump‑sum professional‑services agreement with a small‑business participation goal of 42 % and a design‑start deadline of December 2019. The award was made to CJMW Architecture (Lynchburg, VA). • Project size: ~60 k sf, $45‑55 M construction estimate. • Required expertise: large‑scale university building, performance‑space acoustics, LEED‑Silver, CM‑AR methodology. • Procurement: open competition RFP, eVA‑registered vendors, multiple A/E forms (AE‑1 through AE‑6). • Timeline: proposals due July 10 2019; design to begin Dec 2019; construction anticipated 2023. • Small‑business goal: 42 % discretionary spend to DSBSD‑certified firms.

Attached files

Key dates

Questions due
7/1/2019
Pre-bid meeting
6/25/2019
Bids closed
7/10/2019
Starts
12/1/2019

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Solicitation
Request for Proposal
Industry
Architecture
NAICS
541310
Solicitation №
LU214-19-022

Set-asides

Small Business, Partial Set-Aside

Contract value

$4,000,000

The RFP does not disclose a contract ceiling. However, the document cites an estimated construction cost of $45 million‑$55 million for the Wygal Hall replacement. Professional‑services fees for large university projects typically range from 5 % to 12 % of construction cost, depending on scope (design‑only vs. design‑and‑construction‑admin). Assuming the awarded scope includes at least schematic and preliminary design (mandatory) and possibly full construction documents (optional), a conservative fee of 7 % of the midpoint ($50 M) yields an estimated contract value of about $3.5 M. If the optional construction‑phase services are also funded, the fee could rise to roughly $5 M. Therefore, a reasonable ball‑park estimate for the awarded A/E contract is **$3‑5 million**.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

City of Ely, MN·Minnesota

Top match · 70%

City Hall – Building Envelope Improvements and Stair Repairs

Closes 11/10/2026Opened 10/16/2026

Virginia Polytechnic Institute and State University·Virginia

69% match

Whitehurst Hall Piping Replacement

Closes 11/13/2026Opened 10/26/2026

The University of Texas Health Science Center at Houston (UTHealth Houston)·Texas

68% match

Reuel A. Stallones Rehabilitation and Repair (AE Services)

Closes 11/18/2026Opened 10/21/2026

University of the District of Columbia·District of Columbia

68% match

AHU Replacement & New Boiler

Rolling / TBD closeOpened 3/17/2020

Connecticut Town of Monroe·Connecticut

68% match

Architectural & Engineering Design Services Roof Replacement - Jockey Hollow

Closes 11/2/2026Opened 10/21/2026

Alexandria City Public Schools·Virginia

68% match

Construction Services for William Ramsay Renovation Project

Closes 11/23/2026Opened 10/20/2026

Connecticut Town of Monroe·Connecticut

68% match

Architectural & Engineering Design Services Roof Replacement - Jockey Hollow

Closes 11/2/2026Opened 10/21/2026

City of West Sacramento·California

68% match

Architectural and Engineering (A&E) Services for a Recreation Center Lighting Upgrade

Closes 12/11/2026Opened 10/26/2026

Virginia Tech·Virginia

68% match

Whitehurst Hall Piping Replacement

Closes 11/13/2026Opened 10/26/2026

Connecticut Town of Monroe·Connecticut

68% match

Architectural & Engineering Design Services Roof Replacement - Jockey Hollow

Closes 11/4/2026Opened 10/21/2026

The University of North Carolina·North Carolina

68% match

Residence Hall Renovations - Beall and Bryan

Closes 11/17/2026Opened 10/26/2026

Connecticut YWCA Hartford Region·Connecticut

68% match

YWCA Hartford Region – Drywall & Specialties

Closes 12/1/2026Opened 10/29/2026

Montana Department of Administration, Architecture & Engineering Division·Montana

68% match

Hamilton Hall - Life-Safety Improvements / 3rd & 4th Floor Renovations

Closes 11/18/2026Opened 10/14/2026

Montana State University·Montana

68% match

Hamilton Hall - Life Safety Improvements

Closes 11/18/2026Opened 10/30/2026

Ferris State University·Michigan

67% match

Allied Health Renovation Pre-Construction & Construction Management Services

Closes 11/5/2026Opened 10/15/2026

Montana Department of Administration, Architecture & Engineering Division·Montana

67% match

Hamilton Hall - Life Safety Improvements

Closes 11/18/2026Opened 10/30/2026

City of Hialeah, FL·Florida

67% match

Building Division & Associated Services Expansion of the City Hall Campus

Closes 11/11/2026Opened 10/9/2026

Connecticut Town of Monroe·Connecticut

67% match

Architectural & Engineering Design Services Roof Replacement -Monroe Elementary

Closes 11/2/2026Opened 10/21/2026

Richland School District Two·South Carolina

67% match

Architecture-Engineering (A/E) Service for a Welcome Center and Community Hub

Closes 11/6/2026Opened 10/16/2026

Virginia Community College System - System Office·Virginia

67% match

Replace Grayson Hall Elevator and Loading Dock at Wytheville Community College, Project Code# 260-B5260-075 (M25WC153)

Closes 11/12/2026Opened 10/12/2026

Augusta County Public Schools·Virginia

67% match

ITB 2026-1019 WMHS Old Gym Structural & Masonry Repairs

Closes 11/3/2026Opened 10/19/2026

State University of New York (SUNY)·New York

67% match

Roosevelt Hall Renovations-Design Services

Closes 11/19/2026Opened 10/28/2026

West Virginia State University·West Virginia

67% match

WVSU STUDENT UNION-ROOF REPLACEMENT

Closes 11/12/2026Opened 10/22/2026

Connecticut Town of Monroe·Connecticut

66% match

Architectural & Engineering Design Services Roof Replacement -Monroe Elementary

Closes 11/4/2026Opened 10/21/2026

City of Pembroke Pines·Florida

66% match

Operation and Management of the Building Department

Closes 11/10/2026Opened 9/14/2026