Description
The Crossroads Water Main Installation Project involves the replacement of approximately 1,700 feet of 8-inch water main. The project is being led by the Town of Prescott Valley, and bidders were required to submit their bids by January 11, 2016. The bid tabulation shows multiple bidders with their respective prices, but does not specify which one was awarded the contract. The project includes various components such as water main installation, sawcut, remove curb, remove sidewalk, and pavement replacement.
• The project is located in Prescott Valley, Arizona.
• The bid submission deadline was January 11, 2016.
• A non-mandatory pre-bid conference was held on December 17, 2015.
• The project includes a variety of tasks such as water main installation, sawcut, and pavement replacement.
• The bid tabulation shows a range of prices from different bidders.