The Saddle Club Drainage Improvements contract was awarded to Site and Utility, LLC for a total amount of $4,217,485.50. The contract involves the construction of drainage improvements, including the installation of a 36" RCP pipe. The project is located in Santa Rosa County, Florida, and is expected to be completed within 365 days. The contract includes a change order for an additional $16,100.00 to cover the cost of additional pipe needed to complete the outfall run into the retention pond. The points of contact for the contract include Rebecca Jones, County Engineer/Director, and Kerry A. Smith, Chair of the Board of County Commissioners.
• The contract involves the construction of drainage improvements, including the installation of a 36" RCP pipe.
• The project is located in Santa Rosa County, Florida.
• The contract includes a change order for an additional $16,100.00.
• The points of contact for the contract include Rebecca Jones, County Engineer/Director, and Kerry A. Smith, Chair of the Board of County Commissioners.
• The contract is expected to be completed within 365 days.