Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Wyoming guideWyoming Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Wyoming
  4. ›Civil Engineering
  5. ›Tongue River Restoration Project

Awarded contract·Sheridan County Conservation District·Wyoming

Tongue River Restoration Project

Won by Aqua Terra Restoration, LLC +3 more$513kMultiple Award
Contract source

Awarded vendors

  • Aqua Terra Restoration, LLC
  • Barnum Inc.
  • Whinnery Construction Inc.
  • LJS Concrete and Excavating, LLC

Description

The Tongue River Restoration Project involves the restoration of approximately 1,750 feet of stream near the Town of Dayton, Wyoming. The project includes toe wood bank stabilization, constructed riffles, j-hooks, riparian plantings, and in-channel grading. The project is being led by the Sheridan County Conservation District, and bids were received from various vendors. The project requires a mandatory pre-bid conference and has a bid submission date of April 30, 2019. The project also includes a bid tabulation, which lists the bids received from each vendor. • The project involves stream restoration and habitat improvement • The project requires a mandatory pre-bid conference • The project has a bid submission date of April 30, 2019 • The project includes a bid tabulation, which lists the bids received from each vendor • The project is being led by the Sheridan County Conservation District

Attached files

Key dates

Last updated

Details

Award type
Multiple Award
Procurement
Full and Open Competition
Industry
Civil Engineering
NAICS
237110
Solicitation №
TRD01

Contract value

$512,680

The contract value can be estimated based on the bid tabulation provided. The lowest bid total is $512,680.00 from Aqua Terra Restoration, LLC, and the highest bid total is $710,971.20 from LJS Concrete and Excavating, LLC. Therefore, the estimated contract value is around $512,680.00 to $710,971.20.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

California Grants·California

Top match · 68%

Urban Streams Restoration Program

Rolling / TBD closeOpened 10/1/2026

Washakie County Conservation District·Wyoming

67% match

Big Horn River Bank Stabilization Project

Closes 12/1/2026Opened 10/29/2026

East Bay Municipal Utility District·California

67% match

Mokelumne River Floodplain Habitat Restoration Project

Closes 11/6/2026Opened 9/21/2026

Laramie Rivers Conservation District·Wyoming

67% match

Laramie River - Hart Ranch Restoration

Closes 11/8/2026Opened 8/27/2026

Clean River Partners·Minnesota

67% match

Clean River Partners Cannon River Fish Passage Improvements Project No. 24X.135410

Closes 11/20/2026Opened 10/29/2026

California Grants·California

67% match

Lower American River Conservancy Program

Rolling / TBD closeOpened 6/6/2025

U.S. Department Of Defense·South Dakota

67% match

LOWER BRULE NORTH SHORELINE STABILIZATION AND ECOSYSTEM RESTORATION, ELEMENT 2

Closes 12/3/2026Opened 10/16/2026

U.S. Department Of Defense·Illinois

67% match

DUTCH GAP AQUATIC ECOSYSTEM RESTORATION, ANTIOCH, LAKE COUNTY, ILLINOIS

Closes 8/8/2028Opened 8/12/2025

Environmental Conservation, NYS Department of·New York

67% match

Hudson River Estuary Round 50 Tributary Restoration and Resiliency

Closes 12/17/2026Opened 9/25/2026

California Grants·California

66% match

Proposition 1 Lower Los Angeles River Grants

Rolling / TBD closeOpened 1/27/2025

City of Charlotte·North Carolina

66% match

Newell Stream Restoration Project

Rolling / TBD closeOpened 7/15/2026

County of Ontario·New York

66% match

Geneva Drinking Water Plant Floodplain Restoration Project Feasibility Study

Closes 12/15/2026Opened 10/15/2026

U.S. Department Of Defense·Louisiana

65% match

Mississippi River Outlets, Vicinity of Venice, Louisiana Tiger Pass Bar Channel, Maintenance Dredging, Plaquemines Parish, LA (ED 24-011)

Closes 7/16/2027Opened 7/16/2025

City of Austin·Texas

65% match

Williamson Creek - Tributary 4 Channel Stabilization

Rolling / TBD closeOpened 9/28/2026

U.S. Department Of Defense·Louisiana

65% match

Mississippi River, Baton Rouge to the Gulf, Head of Passes, Hopper Dredge Disposal Area, Project #24-2, Plaquemines Parish, LA (ED 24-009)

Closes 12/4/2026Opened 12/5/2024

California Grants·California

65% match

San Joaquin River Conservancy

Rolling / TBD closeOpened 6/6/2025

California Grants·California

65% match

Proposition 1 Watershed Restoration Grant Program

Rolling / TBD closeOpened 6/18/2025

California Grants·California

65% match

Proposition 4 – River

Rolling / TBD closeOpened 6/11/2025

U.S. Environmental Protection Agency·United States of America

65% match

Southeast New England Program (SNEP) Innovative Restoration Grants

Closes 12/11/2026Opened 10/20/2026

U.S. Department Of The Interior·Colorado

65% match

Y--Pre-Proposal Site Visit

Closes 5/27/2027Opened 5/28/2026

U.S. DOC NOAA - ERA Production·United States of America

65% match

NOAA Great Lakes Fish Habitat Restoration Partnership Grants

Rolling / TBD closeOpened 8/27/2024

NYS Ontario County·New York

65% match

Geneva Drinking Water Plant Floodplain Restoration Project Feasibility Study

Closes 12/15/2026Opened 10/16/2026

U.S. Department Of Defense·Louisiana

64% match

Flood Control, Amite River Tributaries, Louisiana, Comite River Basin, Comite River Diversion Project, Bayou Baton Rouge Rock Chute, East Baton Rouge Parish, Louisiana

Closes 2/6/2027Opened 11/5/2024

California Grants·California

64% match

RMC Lower LA River Grant Program

Rolling / TBD closeOpened 11/19/2024

California Grants·California

64% match

Proposition 68 Rivers and Streams Grant Program – Klamath-Trinity Watershed

Rolling / TBD closeOpened 6/17/2025