The contract is for the renovation and reconfiguration of the Physical Therapy Suite at Fournace Place Administration. The scope of work includes the addition of three ADA restrooms, two offices, and the redesigning of the Reception and Waiting Area. The contract was awarded to J.T. Vaughn Construction, LLC, with a construction bid of $772,800 and an owner's contingency of $154,560. The total estimated construction cost is $927,360. The contract is for a period of 372 days, from June 22, 2023, to June 26, 2024.
• The contract includes work on the HVAC System and Electrical System in the affected area.
• The contract includes new flooring and some minor work on the Acoustical Lay-in ceiling.
• The contract includes the addition of millwork to the existing breakroom and the new enclosed Storage Room.
• The contract includes connecting the new restrooms and a new sink in the Break Room to the existing plumbing.
• The contract includes turning the existing Learning Bathroom into a Storage Room.