The contract is for the construction of a lined dedicated land disposal unit 5. The project consists of stockpiling of existing DLD 5 soils, installation of subgrade 60 mil HDPE geomembrane liner system, and re-installation of suitable stockpiled soil in DLD 5. The contract also includes an infiltrate collection system and pumping station, and a harvested sludge metering and distribution system. The engineer's estimate for the project is $10,600,000.00. The apparent low bidder is Teichert Construction with a bid of $8,770,768.00.
• The project requires a pre-bid conference and walk-through, which was held on January 4, 2017.
• The project requires a Class A license.
• The contract is being awarded by the County of Sacramento, specifically the Contract and Purchasing Services Division.
• The contract is for the construction of a lined dedicated land disposal unit 5.
• The project includes an infiltrate collection system and pumping station, and a harvested sludge metering and distribution system.