The contract is for the construction of the Earl Schmidt Filtration Plant Ammonia Containment and Analyzer Project. The work includes the construction of an ammonia containment pad, sump pump and controls, sump pump discharge pipe, storm drain demolition and installation, demolition of the existing containment area pad and surrounding asphalt paving, new anti-siphon structure, sump pump discharge line to the anti-siphon assembly, installation of a containment pad for an analyzer, analyzer water supply and return lines, pipe support, buried piping with pipe sleeves, and disinfection of water piping. The contract was awarded to Calioguia with a total base bid price of $197,550.00.
• The project involves the construction of a new ammonia containment pad and analyzer.
• The contract includes the demolition of the existing containment area pad and surrounding asphalt paving.
• The project requires the installation of a new anti-siphon structure and sump pump discharge line.
• The contract involves the installation of a containment pad for an analyzer and analyzer water supply and return lines.
• The project requires the disinfection of water piping.