Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Florida guideFlorida Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Florida
  4. ›Construction
  5. ›5/8", 1", 1.5" & 2" Potable Water Meter Change Outs

Awarded contract·City of Fort Myers·Florida

5/8", 1", 1.5" & 2" Potable Water Meter Change Outs

Won by Florida Fire and Backflow$300kSingle Award
Contract source

Awarded vendors

  • Florida Fire and Backflow

Description

The City of Fort Myers has awarded a contract to Florida Fire and Backflow for the change out of 5/8", 1", 1.5", and 2" potable water meters. The contract is for a term of one year, starting on November 8, 2024, and ending on November 7, 2025. The contract is for the provision of plumbing equipment, accessories, and supplies, including water meters and meter fittings. The contract also includes the provision of meter reading devices and plumbing services. The City of Fort Myers is the agency responsible for the contract, and Cathy Scott is the point-of-contact person. Some key aspects of the contract include: • The contract is for a term of one year • The contract includes the provision of plumbing equipment, accessories, and supplies • The contract includes the provision of meter reading devices and plumbing services • The City of Fort Myers is the agency responsible for the contract • Cathy Scott is the point-of-contact person

Attached files

The award documents live at the source — open the contract source above to download them.

Key dates

Starts
11/8/2024
Ends
11/7/2025
Duration
1 years

Last updated

Details

Award type
Single Award
Industry
Construction
NAICS
332919
Solicitation №
ITB 0060-24

Contract value

$300,000

The contract value is not explicitly stated in the document. However, based on the scope of work, which includes the change out of 5/8", 1", 1.5", and 2" potable water meters, and the provision of plumbing equipment, accessories, and supplies, the contract value could be estimated to be in the range of $100,000 to $500,000. This estimate is based on industry standards for similar contracts and the fact that the contract is for a term of one year.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

City of Charlotte·North Carolina

Top match · 68%

Service Water Improvements and Flow Meter Modifications

Rolling / TBD closeOpened 1/31/2026

Georgia Jones County Board of Commissioners·Georgia

65% match

Water Meter Change Out-2026

Closes 11/5/2026Opened 9/28/2026

City of Bedford, TX·Texas

64% match

Water Meter Installations

Closes 11/12/2026Opened 10/9/2026

Connecticut Metropolitan District Commission·Connecticut

63% match

FLOW METER AND RAIN GAUGE REPLACEMENT

Closes 11/5/2026Opened 10/6/2026

City of Seattle·Washington

63% match

Small Single & Multi-Jet Cold Water Meters

Closes 11/18/2026Opened 9/30/2026

Little Blue NRD·Nebraska

63% match

LBNRD Water Meter Replacements

Closes 12/3/2026Opened 10/23/2026

City of Phoenix·Arizona

63% match

Flow Meters and Level Meters Supplemental

Closes 11/5/2026Opened 10/15/2026

LA County Internal Services Department·California

62% match

WATER METERS HIGH PRESSURE 3 YEAR AGREEMENT

Closes 11/18/2026Opened 10/28/2026

City of Holly Grove·Arkansas

62% match

City of Holly Grove Water System Improvements – Water Meter Replacement

Closes 11/18/2026Opened 10/25/2026

The Metropolitan District·Connecticut

62% match

FLOW METER AND RAIN GAUGE REPLACEMENT

Closes 11/5/2026Opened 10/5/2026

The Ohio State University·Ohio

62% match

OSU-255480 JOC HHW and CHW Meter Replacement

Closes 11/12/2026Opened 10/8/2026

Rural Community Water District of Georgetown County·South Carolina

62% match

Water Meter Pit Installation

Closes 11/23/2026Opened 10/27/2026

Massachusetts Town of Kingston·Massachusetts

62% match

Water Meter and Advanced Metering Analytics Maintenance

Closes 11/4/2026Opened 10/15/2026

Washington Suburban Sanitary Commission, MD·Maryland

62% match

Furnish and Deliver Small and Large Water Meters

Closes 11/2/2026Opened 9/21/2026

City of Boca Raton·Florida

61% match

Installation and/or Replacement of Potable and, or Reclaimed Water Meters with AMI Transponders

Closes 11/23/2026Opened 10/20/2026

Hilton Head Public Service District·South Carolina

61% match

Hilton Head Public Service District Meter Replacement RFQ

Closes 11/10/2026Opened 10/8/2026

City of Boca Raton·Florida

61% match

Installation and/or Replacement of Potable and, or Reclaimed Water Meters with AMI Transponders

Closes 11/23/2026Opened 10/20/2026

Arlington County Government·Virginia

61% match

ANNUAL FLOW METER CALIBRATION, INSTALLATION, REPAIR AND REPLACEMENT

Closes 11/9/2026Opened 10/30/2026

City of Folsom·California

60% match

CITY OF FOLSOM: VARIOUS WATER METER PROCUREMENT CONTRACTS

Closes 11/13/2026Opened 9/24/2026

LA Water & Power·California

60% match

146747 5/8"-1", Meter, Cold Water, Positive Displacement

Closes 11/12/2026Opened 10/29/2026

City of Gould·Arkansas

60% match

RFP # 24RU40001 – Contract C – Water Meters

Closes 11/2/2026Opened 10/18/2026

Georgia City of Oxford·Georgia

60% match

City of Oxford Water and Electric Meter Replacement

Closes 11/4/2026Opened 9/29/2026

Massachusetts Peabody Municipal Light Plant·Massachusetts

60% match

Meter Exchange Services

Closes 11/30/2026Opened 10/26/2026

City of Winnebago·Minnesota

60% match

Winnebago, City of Water Meter Replacement BMI Project No. 26X146003

Closes 11/18/2026Opened 10/25/2026

Town of Lexington·South Carolina

60% match

SERVICES FOR POTABLE WATER SYSTEM HYDRAULIC MODELING AND PROGRAM MANAGEMENT

Closes 11/5/2026Opened 9/16/2026