The contract is for the construction of four horizontal collectors at the Kiefer Landfill. The estimated construction cost is $150,000, and the contractor must have a General Engineering Contractor, Class A license. The contract was bid on by four firms, with Tetra Tech BAS, Inc. being the apparent low bidder. The scope of work includes furnishing all labor, materials, and equipment for the construction of the horizontal collectors.
• The contract is for a construction project at the Kiefer Landfill.
• The estimated construction cost is $150,000.
• The contractor must have a General Engineering Contractor, Class A license.
• The contract was bid on by four firms.
• The scope of work includes furnishing all labor, materials, and equipment for the construction of the horizontal collectors.