The contract is for the countywide sidewalk improvements phase 1 project, which includes the furnishing of all labor, materials, and equipment for bicycle and pedestrian facilities and improvements at various intersections in Sacramento County. The project work includes clearing and grubbing, pavement grinding, pavement removal, tree removal, roadway excavation, installation of curb and gutter, sidewalk, storm drainage, aggregate base, asphalt concrete, slurry seal, traffic striping, traffic signal modifications, street lighting, median construction, landscaping, and other work specified on the plans and in the specifications. The contract was awarded to FBD Vanguard Const. Inc. with a bid amount of $977,515.59.
• The project requires a Class A license.
• The engineer's estimate for the project is $941,000.00.
• The contract documents are available online at www.dgs.saccounty.net/capsd/Pages/Construction.aspx.
• A pre-bid meeting was held on February 15, 2017, at 1:30 p.m. at the Sacramento County, Construction Management and Inspection Division (CMID), Conference Room, 9700 Goethe Road, Suite D, Sacramento, CA 95827.