The 99W and South Main Street Improvements Project involves the construction and reconstruction of pavement, guard railing, drainage systems, roadway lighting, traffic signal systems, irrigation systems, landscaping, curbs, driveways, sidewalks, signing, and other traffic control devices. The project includes 7.8 miles of roadbed recycling and paving, widening and reconstruction of a city street, and construction of a roundabout intersection at the Interstate 5 northbound ramps at South Main Street in Red Bluff. The Engineer's Estimate for the base bid of this contract is $12,500,000, and the combined Engineer's Estimate for Additive Alternates 1 and 2 is $5,100,000.
• The project requires the contractor to list all subcontractors performing work in excess of 1/2 of 1 percent of the total bid, or $10,000, whichever is greater.
• The contractor must provide complete information about each subcontractor, including name, city, state, California contractor license number, public works contractor registration number, bid item numbers, description of work, and percentage of each bid item number.
• Failure to provide complete information in columns 1 through 4 at the time of bid will result in a nonresponsive bid.
• The project includes various bid items, such as guardrail, signage, striping, electrical work, surveying, and asphalt emulsions.
• The contractor must comply with all applicable laws, regulations, and standards, including those related to environmental protection, traffic control, and worker safety.