The Alaska Energy Authority contracted a single vendor to upgrade the bulk‑fuel infrastructure for the remote community of Edna Bay. The scope encompassed site earthwork, construction of a secondary‑containment tank farm, supply and installation of three above‑ground fuel storage tanks (including a protected dispensing tank), a three‑product truck‑fill header, retail and fleet dispensing equipment, an attendant kiosk, spill‑response equipment, and a standby diesel generator. The work required compliance with UL 142 and UL 2085 tank standards, NEMA 12 electrical enclosures, and Alaska environmental and safety regulations. The contract was awarded on a firm‑fixed‑price basis and required a 5 % bid guarantee, performance and payment bonds, and a 90‑day bid validity period.