This contract involves the maintenance, repair, and partial replacement of poured‑in‑place playground surfacing at seven elementary schools and two charter‑school sites within the Alameda Unified School District. The scope includes cleaning, patching damaged wear‑layer areas, edge‑band replacement at specified locations, a full wear‑layer replacement at one school, and a $20,000 allowance for additional patch work. The work must comply with CPSC and ASTM playground safety standards, be performed under prevailing‑wage rules, and carry a minimum two‑year warranty on new surfacing. The district requires a 10 % bid bond, 100 % performance and payment bonds, and adherence to California public‑works licensing and labor‑code registration. The project runs from early June to early August 2025, with a fixed‑price award of approximately $88,794.
• Clean, patch, seal, and replace wear‑layer surfacing on ~19,975 SF of playground area.
• Edge‑band replacement at Maya Lin Elementary and full wear‑layer replacement at Love Elementary.
• All work subject to prevailing‑wage requirements, bonding, licensing, and a two‑year warranty.