Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Massachusetts guideMassachusetts Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Massachusetts
  4. ›Construction
  5. ›Bridge Rehabilitation (B26-1) / DPW

Awarded contract·City of Worcester·Massachusetts

Bridge Rehabilitation (B26-1) / DPW

Won by New England Infrastructure$748kSingle Award
Contract source

Awarded vendors

  • New England Infrastructure

Description

This municipal contract calls for the comprehensive rehabilitation of three aging bridges within Worcester, MA. The scope includes structural repairs (concrete, masonry, crack sealing, grout injection), replacement of guardrails, sidewalk and pavement work, erosion and slope stabilization, traffic‑control installations, and associated water‑control measures. Work must comply with MassDOT specifications, prevailing‑wage requirements, OSHA safety standards, and MassDEP wet‑land protection orders. The project is funded with Chapter 90 state money, requires a 5 % bid bond, and mandates performance and payment bonds equal to the contract sum. The City will award the contract to the lowest responsible and eligible bidder, which was New England Infrastructure at $748,000. The contract’s timeline runs from bid award (within 90 days of July 15 2026) through substantial completion by 15 Nov 2027 and final close‑out by 15 Dec 2027. Key points: • Three bridges (June St, Mower St, NE Cutoff) over Tatnuck and Poor Farm Brooks. • Required tasks: concrete repair, masonry grout fill, epoxy‑coated reinforcement, erosion control, traffic‑control devices, and sidewalk/pavement restoration. • Strict environmental controls (MassDEP Order of Conditions) and weekly certified‑payroll reporting. • Vendor must be pre‑qualified by MassDOT and meet prevailing‑wage and safety‑training obligations.

Attached files

Key dates

Bids closed
7/15/2026
Ends
12/15/2027
Duration
17 months

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Industry
Construction
NAICS
237990
Solicitation №
8740-M7

Contract value

$748,000

The award documents list a total bid amount of $748,000 for New England Infrastructure. The original project description also cites an estimated construction cost of $395,848.09, but the winning bid supersedes that figure. Therefore the contract value is effectively $748,000. This figure reflects the full scope of bridge rehabilitation, including labor, materials, equipment, performance bonds, and required contingencies.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

Virginia Department of Transportation·Virginia

Top match · 72%

B35_2027 BRIDGE REHABILITATION

Closes 11/18/2026Opened 10/13/2026

Illinois Tollway·Illinois

72% match

RR-26-2066 - Roadway & Bridge Rehabilitation & Plaza Improvements

Closes 12/3/2026Opened 10/26/2026

Washington DC Transportation (DDOT)·District of Columbia

72% match

Rehabilitation/Reconstruction of 27th Street Bridge over Broad Branch Stream

Closes 11/2/2026Opened 9/24/2026

Connecticut Dept. of Transportation·Connecticut

71% match

Rehabilitation of Bridge Nos. 06200A and 06200B (Baldwin Bridge) I-95 NB and SB

Closes 11/4/2026Opened 8/19/2026

Massachusetts Department of Transportation·Massachusetts

71% match

616276 FOXBOROUGH-MIDDLEBOROUGH-NORTON FAP No. STP(BR-OFF)-004S(017)X Bridge Preservation along I-

Closes 11/3/2026Opened 9/21/2026

Connecticut Dept. of Transportation·Connecticut

70% match

Rehabilitation of Bridge Nos. 06200A and 06200B (Baldwin Bridge) I-95 NB and SB

Closes 1/13/2027Opened 8/19/2026

Connecticut Dept. of Transportation·Connecticut

70% match

Rehabilitation of Bridge Nos. 06200A and 06200B (Baldwin Bridge) I-95 NB and SB

Closes 1/13/2027Opened 8/19/2026

Georgia City of Chattahoochee Hills·Georgia

70% match

RFP27-001 Cochran Mill Park Bridge Repair/Replacement

Closes 11/19/2026Opened 10/16/2026

Delaware River Joint Toll Bridge Commission·New Jersey

70% match

Portland‑Columbia Toll‑Supported Pedestrian Bridge Rehabilitation

Closes 11/5/2026Opened 10/1/2026

Somerset County·New Jersey

70% match

REHABILITATION OF COUNTY BRIDGE NO. F0807 DAVENPORT STREET OVER PETERS BROOK, BOROUGH OF SOMERVILLE, SOMERSET COUNTY, NEW JERSEY

Closes 11/5/2026Opened 10/14/2026

Connecticut Dept. of Transportation·Connecticut

70% match

Rehabilitation of Bridge Nos. 06200A and 06200B (Baldwin Bridge) I-95 NB and SB

Closes 11/4/2026Opened 8/19/2026

City of Norfolk·Virginia

69% match

Virginia Beach Blvd Over NS RR Bridge Rehabilitation

Closes 11/16/2026Opened 10/2/2026

Virginia Department of Transportation·Virginia

69% match

B34_2027 BRIDGE REHABILITATION

Closes 11/18/2026Opened 10/13/2026

Lewis County·Washington

69% match

Davison Rd MP 0.01 Bridge Rehabilitation

Closes 11/19/2026Opened 10/29/2026

City of Minot·North Carolina

69% match

RFQ: CITY BRIDGE REHABILITATION PROJECT 5060

Closes 11/20/2026Opened 10/30/2026

Rhode Island Turnpike and Bridge Authority·Rhode Island

69% match

Pell Bridge Rehabilitation

Closes 11/2/2026Opened 9/1/2026

NYS Niagara County·New York

68% match

PIN 5765.39: D041682, Replacement of CR 55 Royalton Center Road Bridge (BIN 3360080) over Mud Creek in the Town of Royalton, Niagara County

Closes 11/5/2026Opened 9/24/2026

City of Fargo·North Dakota

68% match

BR-27-C1 - Paving and Utility Rehab/Reconstruction

Closes 11/18/2026Opened 10/17/2026

County of Chester·Pennsylvania

68% match

Bridge Rehabilitation for County Bridge #190

Closes 11/25/2026Opened 10/22/2026

City of Wilmington·Delaware

68% match

27019PW – Digester 4 Rehabilitation

Closes 11/17/2026Opened 9/22/2026

Rhode Island Turnpike and Bridge Authority·Rhode Island

68% match

Addendum 3

Closes 11/2/2026Opened 9/1/2026

County of Chester·Pennsylvania

68% match

Bridge Rehabilitation for County Bridge #196 and Construction for County Bridge #326

Closes 11/25/2026Opened 10/23/2026

Connecticut City of Norwalk·Connecticut

68% match

DPW Request For Qualifications For Inspection And Evaluation Of City-Owned Brid

Closes 11/17/2026Opened 10/26/2026

Massachusetts Department of Transportation·Massachusetts

67% match

607349 NORWELL- PEMBROKE- MARSHFIELD- BRIDGE REPLACEMENT, N-24-004=P-05-008, ROUTE 3 (NB & SB) OVER

Closes 11/13/2026Opened 1/30/2026

Somerset County·New Jersey

67% match

REHABILITATION OF COUNTY BRIDGE NO. F1306 RIPPLING BROOK WAY OVER TRIBUTARY OF MINE BROOK, BOROUGH OF BERNARDSVILLE, SOMERSET COUNTY, NEW JERSEY

Closes 11/5/2026Opened 10/15/2026