This contract is for the replacement of boilers at two education centers, Avondale East Education Center and Linn Education Center. The contract includes the removal and reinstalling of new steam and hot water boilers, as well as associated piping, controls, and electrical work. The contract was awarded to multiple vendors, with a total accepted bid of $180,041.00, $205,406.00, and $208,870.00. The scope of work includes the base bid and allowance for each vendor.