Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Washington guideWashington Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More water and wastewater bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Washington
  4. ›Water and Wastewater
  5. ›2020-2 SWM Stormwater Projects

Awarded contract·Snohomish County·Washington

2020-2 SWM Stormwater Projects

Won by Seton Construction$1.2MAwarded 4/15/2020Single Award
Contract source

Awarded vendors

  • Seton Construction

Description

This contract awards Snohomish County Public Works the design‑build retrofit and low‑impact‑development upgrades for its storm‑water facilities. The scope includes site clearing, extensive earthwork, demolition of existing drainage structures, installation of new corrugated polyethylene storm‑sewer pipes (12‑, 24‑, and 36‑inch), construction of catch basins, placement of permeable ballast, crushed base and top courses, pervious concrete pavement, hot‑mix asphalt, erosion‑control measures (blankets, hydro‑seed, wood‑strand mulch), temporary traffic control, fencing, and a COVID‑19‑related force‑account line item. Bids were submitted by multiple contractors, each providing a detailed unit‑price schedule; the award was made to Seton Construction. The contract requires a 5 % bid bond, certifications of non‑collusion, wage‑payment compliance, and a recycled‑material percentage (minimum 5 %). The project’s engineer’s estimate is $1.199 million, and work may not begin before July 1 2020. • Comprehensive storm‑water retrofit and LID improvements across Snohomish County. • Required services: demolition, excavation, pipe installation, pavement, erosion control, traffic control, and COVID‑19 safety measures. • Awarded to Seton Construction; 5 % bid bond and multiple statutory certifications required.

Attached files

Key dates

Bids closed
4/14/2020
Intent to award
4/15/2020
Awarded
4/15/2020
Starts
7/1/2020

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Industry
Water Management and Sanitation
NAICS
237110
Solicitation №
PW-006-20SR

Contract value

$1,200,000

The engineer’s estimate for the project is explicitly stated as $1,199,000. Since the award is based on the lowest responsive bid and a 5 % bid bond is required, the contract value is expected to be close to the estimate. No final award amount is printed, but the bid bond amount (5 % of the bid) would be approximately $60,000 if the contract were $1.2 M. Therefore a reasonable ball‑park for the total contract is $1.1‑$1.3 million, with $1.2 million being the most likely figure.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

City of West Miami·Florida

Top match · 72%

West Miami - City-Wide Stormwater Master Plan

Closes 11/24/2026Opened 10/22/2026

Georgia City of Byron·Georgia

70% match

Stormwater Program Management

Closes 11/19/2026Opened 10/20/2026

City of Charlotte·North Carolina

70% match

FY2026 and FY2027 Various Storm Water Services Projects

Rolling / TBD closeOpened 2/23/2026

City of Cape Canaveral·Florida

69% match

Stormwater Pilot Project

Closes 11/12/2026Opened 10/15/2026

Johnson County·Kansas

69% match

Stormwater Management Program

Closes 12/1/2026Opened 10/27/2026

City of Shawnee·Kansas

68% match

2027 Annual Stormwater Pipe Repair Project

Closes 11/12/2026Opened 10/22/2026

City of Cape Canaveral·Florida

68% match

Fillmore Avenue Townhomes Stormwater Construction

Closes 11/5/2026Opened 10/8/2026

Charles County Government·Maryland

68% match

Stormwater Facilities Task Order Services

Closes 11/5/2026Opened 10/8/2026

Maryland Charles County Government·Maryland

68% match

Stormwater Facilities Task Order Services

Closes 11/5/2026Opened 10/12/2026

U.S. Department Of Defense·Virginia

68% match

JBMHH Stormwater Management Facility Maintenance and Repair Services

Closes 11/6/2026Opened 10/15/2026

City of Georgetown·Texas

67% match

Stormwater Quick Wins - Small Project Design

Closes 11/19/2026Opened 10/18/2026

Washougal, WA·Washington

67% match

Stormwater Filter Facility Maintenance

Closes 11/5/2026Opened 10/9/2026

City of Charlotte·North Carolina

66% match

Irwin Creek WWTP Stormwater Improvements Project

Rolling / TBD closeOpened 5/1/2026

City of Douglas WY·Wyoming

66% match

SWM #1 - Surge Tank Replacement Project

Closes 11/10/2026Opened 10/23/2026

City of Virginia Beach·Virginia

66% match

COVB-27-101729 - Annual Service Contract for Stormwater Engineering Services

Closes 12/11/2026Opened 10/27/2026

City of Hollywood·Florida

66% match

SW-2 Bypass Pumping & Rehabilitation (Project No. 25-11070A)

Closes 11/25/2026Opened 10/20/2026

Georgia City of Covington·Georgia

65% match

2026-26 Annual Stormwater Rehabilitation and Maintenance Construction Services

Closes 1/12/2027Opened 10/20/2026

City of Sandy·Utah

65% match

2027 Sandy City Utility Projects

Closes 11/18/2026Opened 10/21/2026

City of Austin·Texas

65% match

Boggy Creek MLK TOD Strmwater Conveyance Improvements Ph-3

Rolling / TBD closeOpened 9/14/2026

Pee Dee Regional Council of Governments·South Carolina

65% match

Stormwater Drainage Study

Closes 12/1/2026Opened 10/20/2026

Connecticut Town of Plainfield·Connecticut

65% match

MS4 Stormwater GIS Data Development Screening and Reporting Services

Closes 11/4/2026Opened 9/17/2026

Washington DC Energy and Environment (DOEE)·District of Columbia

65% match

FY26 Parkland Stormwater Retrofits - DPR V

Closes 11/24/2026Opened 10/22/2026

City of South Lake Tahoe·California

65% match

Drainage Master Plan Update & Areawide Facility Analyses

Closes 11/17/2026Opened 10/1/2026

Georgia City of Sandy Springs·Georgia

65% match

27-014 Trenchless Stormwater Pipe Rehabilitation Project - 2027

Closes 11/19/2026Opened 10/19/2026

City of Coronado·California

65% match

First Street Stormwater Pump Station Flood Relief Project

Closes 11/9/2026Opened 9/23/2026