The Corona Range Dormitories construction project involves the construction of a three-bedroom cabin with a bathroom, kitchenette, living space, and small covered porch. The project also includes site preparation and the installation of an NFPA-13R sprinkler system. The contract was awarded to ESA Construction, Inc. for a total bid of $275,736.00. The project is expected to be completed within 180 calendar days from the Notice to Proceed.
• The project includes the construction of a three-bedroom cabin with a bathroom, kitchenette, living space, and small covered porch.
• The project includes site preparation and the installation of an NFPA-13R sprinkler system.
• The contract was awarded to ESA Construction, Inc. for a total bid of $275,736.00.
• The project is expected to be completed within 180 calendar days from the Notice to Proceed.
• The project includes three alternates: Penefin 'clear' finish on exterior log siding and posts, 6" diameter Hand Scraped and Tapered Posts, and Clear Creek Concrete Log Siding with matching trim.