The contract is for the emergency scour repair to the upstream and downstream ends of the Riverview Road Bridge (AKR 009-0583) over Yellow Creek. The project includes the removal of soft silt material, pouring grout and grout-filled fabric bags to fill voids, and placing rip rap in the channel and in front of the inlet wing walls. The engineer's estimate for the project is $173,075.00, and the completion date is November 30, 2018. The contract was awarded to Lockhart Concrete Co.
• The project includes emergency scour repair to the upstream and downstream ends of the bridge.
• The contractor will remove soft silt material from the channel bottom and place rip rap in the channel and in front of the inlet wing walls.
• The engineer's estimate for the project is $173,075.00.
• The completion date is November 30, 2018.