The El Dorado Irrigation District awarded a fixed‑price services agreement to BWD General Engineering for the replacement of a failed surge‑tank bladder at the El Dorado Hills Raw Water Pump Station. The district will supply the new bladder; the contractor must provide all labor, equipment (including a crane capable of lifting a 19,000‑lb tank on a steep‑incline roadway), safety measures, and project management to remove the old bladder, reinstall the tank, and install the new bladder. The solicitation was open to full and open competition, with bids due March 6 2026 and the award announced in a Notice of Intent to Award on March 18 2026. The contract value is $34,355 and is a single‑award, firm‑fixed‑price contract.
• Scope: remove existing surge‑tank bladder, re‑assemble tank, install new bladder (provided by district).
• Requirements: crane & dunnage, certified personnel, compliance with California prevailing‑wage, safety, insurance, and documentation.
• Procurement: lowest‑price award, full open competition, no set‑aside, award to BWD General Engineering.