The Harvest Water Elk Grove Transmission Pipeline Project – Segment 1 involves the construction of approximately 1.6 miles of large diameter (66”) recycled water pipeline. The project requires a General Engineering Contractor, Class A license. The estimated contract cost is $20,000,000. The bid opening summary lists the ranking of bids from four firms, with Mountain Cascade, Inc. being the apparent low bid at $16,788,910.00. The scope of work includes the construction of the pipeline, and the project is located in Elk Grove, California.
• The project requires a mandatory pre-bid conference and walk-through.
• The bid submission date was January 29, 2025.
• The bid opening was held on January 29, 2025.
• The Sacramento Area Sewer District is in the process of completing a review of the bids.