The City of La Porte is seeking competitive bids to construct an addition to an existing fire field training facility. The original facility was built in 1998 and is a pre-fabricated type facility manufactured by Whirlwind. The matching addition will include a storage bay for equipment and a covered area. The bid tabulation is preliminary and not indicative of award, with other factors potentially applying. Key aspects of the contract include:
• The facility addition will be constructed according to specifications
• The contract includes options for adding insulation to the roofing area and doors of various sizes
• The bid tabulation lists several companies, including Aztec, DT, and TUCON, with corresponding bid prices
• The contract is subject to various terms and conditions, including acceptance requirements and delivery information