This contract is for the installation of transmission poles in Snohomish County, Washington. The project includes the installation of silt fence and other sedimentation control Best Management Practice measures, a 30’ quarry spall construction entrance, and a Baker tank to detain all run-off water. The contract also provides for the installation of CMP (corrugated metal pipe), CDF (control density fill) to line space between CMP and earth, and the removal of all spoils from the site. The estimated value of the contract is $150,000.00.
• The contract is for a specific project in Snohomish County, Washington
• The project includes installation of transmission poles and sedimentation control measures
• The contract provides for the installation of CMP and CDF
• The estimated value of the contract is $150,000.00