The contract is for the repairs and improvements of the Calle Real Water Loop Phase 1. The project consists of the repairs of several nonoperational isolation valves, installation of new isolation valves, and the installation of new sub-water meters. The contract was awarded to three vendors: Tierra Contracting, Raminha Construction, Inc., and Coastal Construction. The bid results show that the base bid prices for the three vendors are $382,836.00, $578,444.00, and $583,945.00 respectively.
• The project address is COSB Calle Real Campus - Intersection of Camino del Remedio and Calle Real, Santa Barbara, CA 93110.
• The project number is 19012.
• The bid due date was 4/6/2022.
• The method of bid receipt was electronically via email: Public Purchase.
• The anticipated project duration for the three vendors is 35 work days, 60 work days, and 44 work days respectively.