The contract is for cathodic protection and corrosion control enhancements to the two Enchantment Pressure Reducing Valve and Sustaining Valve vaults located along Enchantment Road. The work includes necessary improvements for safely operating the facilities until an above-grade facility can be budgeted and built. The contract was awarded to Mainline with a total base bid of $357,900.00. Key aspects of the contract include:
• Cathodic protection and corrosion control enhancements
• Improvements for safely operating the facilities
• Awarded to Mainline with a total base bid of $357,900.00
• The contract is for the Enchantment Road PRV CP and Repair project