The Bear River Erosion Control Project at Bear River State Park is a construction project aimed at controlling erosion at the park. The project was bid on by several companies, with Taylor Construction, Inc. being awarded the contract for $34,069.64. The project involves the implementation of erosion control measures to protect the park's natural resources. The scope of work includes the installation of erosion control structures and the restoration of disturbed areas. The project is expected to be completed within a certain timeframe, but the exact duration is not specified.
• The project is located at Bear River State Park in Wyoming.
• The contract was awarded to Taylor Construction, Inc. for $34,069.64.
• The project involves erosion control measures to protect the park's natural resources.
• The scope of work includes the installation of erosion control structures and the restoration of disturbed areas.
• The project is expected to be completed within a certain timeframe, but the exact duration is not specified.