The contract is for the rehabilitation of the Cougar Mountain 3 Pump Station. The work includes replacement of the existing pump equipment and diesel-driven fire pump with new pumps equipped with variable frequency drives (VFDs), new standby generator and subbase fuel storage tank, and replacement of the electrical equipment and electrical service. The project also includes new outside bladder surge tank, new dehumidifier, and miscellaneous site improvements. The engineer's estimate for the project is $1,174,360.00.
• Replacement of existing pump equipment and diesel-driven fire pump
• Installation of new pumps with variable frequency drives (VFDs)
• Replacement of electrical equipment and electrical service
• Installation of new standby generator and subbase fuel storage tank
• New outside bladder surge tank and dehumidifier
• Miscellaneous site improvements