This contract is for professional electrical engineering services to conduct arc flash studies for seven Generation Facilities. The project is expected to last two years, with the arc flash study of the 100MW Jackson Hydro Project taking place in 2024 and the remaining six Generation Facilities' arc flash studies taking place in 2025. The contract was awarded to Hatch. The bid was posted on July 9, 2024, and the bid submission date was August 6, 2024.
• The project involves conducting arc flash studies for seven Generation Facilities.
• The contract is for a two-year period.
• The bid was posted on July 9, 2024, and the bid submission date was August 6, 2024.
• The scheduled bid award date is September 17, 2024.
• The point of contact for this bid is Shana Rollins.