The East Hartford Water Main Replacement Project calls for the complete replacement of approximately 12,900 linear feet of 8‑inch ductile‑iron water main, together with associated appurtenances, new fire hydrants, water‑service transfers, and meter pit installations across multiple streets in East Hartford, CT. The work includes all labor, equipment, permits, and related costs necessary to install the new water main and supporting infrastructure, following the specifications in Section 01010 Summary of Work. A mandatory pre‑bid conference was held on 22 June 2023, and sealed bids were due by 17 July 2023. The Metropolitan District will receive, safeguard, and publicly open the bids via video teleconference.
• Scope: ~12,900 LF of 8‑inch ductile‑iron water main, hydrants, service transfers, meter pits.
• Location: Town of East Hartford, Connecticut (multiple street locations listed).
• Procurement: Sealed bid, ITB, full and open competition with a mandatory pre‑bid meeting.
• Timeline: Bidding window 14 Jun 2023 – 17 Jul 2023; award recorded 7 Aug 2024.
Attached files
The award documents live at the source — open the contract source above to download them.