This contract concerns the replacement of a boiler at the municipal Transit Center, with two mandatory alternates covering pump replacement and pump relocation. The work is structured as a lump‑sum competitive bid, with two vendors submitting separate prices for the base scope and each alternate. The bid submission deadline was March 6 2026, and the total possible contract value ranges from roughly $52,000 for the base boiler replacement alone up to $150,000 if all alternates are exercised. The procurement was conducted by the City of Waukesha, Wisconsin, though specific agency contact details are not provided in the excerpt. The scope includes:
• Removal and installation of a new boiler (base scope).
• Mandatory Alternate #1: Removal and replacement of circulation pumps and housings.
• Mandatory Alternate #2: Relocation of pumps from overhead to floor‑mount positions.
The competitive nature and modest contract size make this opportunity relevant for firms specializing in boiler, pump, and mechanical system replacements within the municipal construction market.