The Alabama Port Authority is awarding a contract to replace aging high‑bay and flood‑light fixtures at Pier B South with energy‑efficient LED lighting. The scope includes demolition of 223 existing high‑bay fixtures and 46 flood‑lights, installation of new LED fixtures with dimming, occupancy sensing, battery backup (except for flood‑lights per Addendum 2), and bird‑guards, plus associated low‑voltage control systems. The contractor must provide a five‑year workmanship warranty, secure performance and payment bonds equal to 100 % of the contract price, and maintain extensive insurance coverage. Work must commence within ten days of the Notice to Proceed and be completed within 140 calendar days.