The contract is for the replacement of a septic system at 3139 Houston Rd. Norton, Ohio 44203, as part of the Household Sewage Treatment System (HSTS) Program. The project requires the installation of an NPDES compliant aerobic treatment unit, and the contractor must ensure that all work is done in accordance with applicable local building codes and regulations. The contract also includes the connection of downspouts and the inspection of the interior of the unit to ensure all plumbing is connected correctly. The winning bidder will enter into a contract with the County of Summit to replace the failing septic system. Some key points to consider include:
• The project requires a mandatory pre-bid meeting, which was held on March 28, 2019, at 9:00 am at the Department of Community and Economic Development.
• Bidders must attend the pre-bid meeting to become prequalified bidders.
• The contractor must provide a minimum of $2,000,000 of General Commercial Liability Insurance and $1,000,000 of Commercial Auto Liability.
• The contractor must list the County of Summit as an additional insured on their policy.
• The project is subject to Davis Bacon wage rates.