The contract is for the replacement of the existing Reverse Filtration (RF) PVC Header piping within the Temple Membrane Facility with a new HDPE header piping. The project involves the removal of the existing piping and the installation of a new piping system from the flexible connections at the RF pumps to the flexible connections at each of the eleven (11) membrane racks. The bid was awarded to PrimeSpec Construction, LLC with a total base bid of $229,400.00.
• The project is located at the Temple Membrane Facility.
• The bid was published on March 24, 2017, and the submission date was April 20, 2017.
• A pre-bid conference was held on April 5, 2017, at the Membrane Plant.
• The contract documents include specifications, contract documents, and addendums.
• The bid bond, bond requirement affidavit, and credit check authorization were all required.