Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Utah guideUtah Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Utah
  4. ›Construction
  5. ›DFCM Construction-Logan Summit Conc & Riverside Flr…

Awarded contract·State of Utah, Division of Facilities Construction and Management (DFCM)·Utah

DFCM Construction-Logan Summit Conc & Riverside Flr Drain-Maint Station Imp-Pre-Qual Gen-25054900

Won by Landmark Companies, Inc. +2 more$247kMultiple Award
Contract source

Awarded vendors

  • Landmark Companies, Inc.
  • DWA Construction, Inc.
  • Mike Funk Construction

Description

The State of Utah, Division of Facilities Construction and Management (DFCM) has awarded a contract for the construction of the Logan Summit Concrete and Riverside Floor Drain - Maintenance Station Improvements project. The project involves replacing concrete in locations around the overhead doors at the UDOT Logan Summit Maintenance Shop and replacing the gasketing and weather stripping on the overhead doors. Additionally, the existing trench drain/waterway will be removed and replaced with a drain line from the ice machine at the UDOT Riverside Maintenance Shop. The contract was awarded to three vendors: Landmark Companies, Inc., DWA Construction, Inc., and Mike Funk Construction. The total bid prices for each vendor are $213,893.00, $241,800.00, and $297,700.00, respectively. The project is expected to be completed by November 27, 2024. * The project involves construction services, including replacement of concrete and installation of a drain line. * The contract was awarded through an Invitation for Bid (IFB) process. * The vendors were required to be pre-qualified during Stage I of the RFS. * A mandatory pre-bid meeting and site visit were held on July 23, 2024. * The contract documents are available on the Utah Public Procurement Place website.

Attached files

Key dates

Ends
11/27/2024

Last updated

Details

Award type
Multiple Award
Industry
Construction
NAICS
236220
Solicitation №
CS25003

Contract value

$247,100

The contract value can be estimated based on the total bid prices provided by the vendors. The lowest bid price is $213,893.00, and the highest bid price is $297,700.00. Therefore, the estimated contract value is between $213,893.00 and $297,700.00. However, the construction cost estimate mentioned in the document is $247,100.00, which is likely to be the actual contract value.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

Georgia Pa​ulding County Water System·Georgia

Top match · 69%

27012-3802, Richland Creek WTP Pressure Reducing Valve & Flow Meter Vault

Closes 11/13/2026Opened 10/9/2026

Riverton City·Utah

69% match

CC26-475 Main Water Tank Drainline Upgrade Project

Closes 11/17/2026Opened 10/30/2026

Vantage Group - Boston Logan Terminal C Redevelopment·Massachusetts

68% match

Construction Management‑at‑Risk (CMR) Services – Terminal C Redevelopment, Boston Logan International Airport

Closes 11/6/2026Opened 10/21/2026

Rural Community Water District of Georgetown County·South Carolina

67% match

Water Meter Pit Installation

Closes 11/23/2026Opened 10/27/2026

Ohio Department of Natural Resources·Ohio

67% match

Lake Logan Dam Improvements

Closes 11/6/2026Opened 10/16/2026

City of Fargo·North Dakota

67% match

City of Fargo RFP - Engineering Services: Project No. SR-28-A0 Project No. SN-28-A0 Project No. SN-29-A0

Closes 11/13/2026Opened 10/17/2026

Riverton City·Utah

66% match

CC26-475 Main Water Tank Drainline Upgrade Project

Closes 11/17/2026Opened 10/30/2026

Massachusetts Port Authority (Massport)·Massachusetts

66% match

Terminal C Redevelopment Logan International Airport

Closes 11/6/2026Opened 10/21/2026

Public Water Supply District No. 2 of St. Charles County·Missouri

66% match

Western Transmission Main Phase 4C

Closes 11/19/2026Opened 10/9/2026

City of Virginia Beach·Virginia

65% match

COVB-26-101639-2 - Central Resort District Drainage Improvement Phase 1 Design-Build

Closes 11/5/2026Opened 10/23/2026

New York City Department of Environmental Protection·New York

65% match

82627B0022-BEDC-NR-107: Structural improvements to the North River WRRF

Closes 12/9/2026Opened 10/22/2026

Connecticut Cromwell Fire District·Connecticut

65% match

Cromwell Fire District - Water Interconnection Project

Closes 11/6/2026Opened 9/29/2026

City of Norfolk·Virginia

65% match

CSRM Phase 1A Floodwall Construction - Preload & Wick Drains

Closes 11/5/2026Opened 9/29/2026

City of Tampa, Florida·Florida

65% match

RFQ 27-D-00003 43rd St. Pump Station Force Main Replacement Design

Closes 12/3/2026Opened 10/30/2026

City of DeLand·Florida

65% match

2024 Downtown South Water Main Improvements-East Phase

Closes 11/17/2026Opened 10/13/2026

U.S. Department Of The Interior·New Mexico

65% match

C--BGNDRF PIPING UPGRADES

Closes 11/13/2026Opened 10/7/2026

Town of Dumfries·Virginia

65% match

IFB # 27-003 - UTILITY ABANDONMENT AND SITE RESTORATION AT 3800 GRAHAM PARK ROAD

Closes 11/5/2026Opened 10/15/2026

City of Riverside·California

65% match

PARK AVENUE WATER TRANSMISSION MAIN REPLACEMENT

Closes 12/3/2026Opened 10/30/2026

Connecticut Cromwell Fire District·Connecticut

65% match

Cromwell Fire District - Water Interconnection Project

Closes 11/6/2026Opened 9/29/2026

City of Bellevue·Washington

65% match

2027 Phase 1 Water Main Replacement

Closes 11/12/2026Opened 10/22/2026

New York City Department of Environmental Protection·New York

65% match

82627B0022-BEDC-NR-107 Structural improvements to the North River WRRF

Closes 12/9/2026Opened 10/22/2026

Oregon Tualatin Valley Water District·Oregon

65% match

TVWD ITB 2027-004 176th & Sugar Plum Water Main Replacement

Closes 11/19/2026Opened 10/28/2026

City of Charlotte·North Carolina

65% match

Craighead/Tryon Storm Drainage Improvement Project

Rolling / TBD closeOpened 5/14/2026

City of South Lake Tahoe·California

65% match

Drainage Master Plan Update & Areawide Facility Analyses

Closes 11/17/2026Opened 10/1/2026

Massachusetts Town of Westborough·Massachusetts

65% match

RFQ General and FSB Contractor for New Dispatch Facility

Closes 11/4/2026Opened 10/23/2026